Chapter 8: Configuring Switches for Stacking
132
11
Designate the ports as stacking ports with the STACKPORT command.
awplus(config-if)# stackport
% Save the config and restart the system for this change to take
effect.
12
Return to the Global Configuration mode.
awplus(config-if)# exit
13
Return to the Privileged Exec mode.
awplus(config)# exit
14
Enter the WRITE command to save your change. If this is the first management
session, the switch adds the configuration file DEFAULT.CFG to flash memory, for
storing your configuration changes. If you do not save your changes, they will be
discarded and you will have to reenter them when you reboot the switch in the next
step.
awplus# write
Building configuration ...
[OK]
15
Restart the switch with the REBOOT command.
awplus# reboot
reboot system? (y/n):
awplus#
16
Type “Y” for yes.
17
Wait two minutes for the switch to initialize its management software.
18
Check the ID LED in the management panel on the front panel and do one of the
following:
- If the ID LED is displaying the number 1, VCStack is now enabled on the switch. Go
to “Verifying the Master Switch,” next.
- If the ID LED is displaying “0,” VCStack is still disabled. Repeat this procedure,
being sure to issue the WRITE command to save your change before resetting the
switch.
Table 16. Configuring the Master Switch (Continued)
Step
Description and Command
Содержание AT-x950-28XSQ
Страница 8: ...Contents 8 ...
Страница 12: ...Tables 12 ...
Страница 16: ...Preface 16 ...
Страница 62: ...Chapter 2 Virtual Chassis Stacking 62 ...
Страница 80: ...Chapter 3 Beginning the Installation 80 ...
Страница 90: ...Chapter 4 Installing Power Supplies and Optional XEM2 Line Card 90 ...
Страница 102: ...Chapter 6 Installing the Switch in an Equipment Rack 102 ...
Страница 106: ...Chapter 7 Installing the Switch on a Wall 106 Figure 67 Minimum Wall Area Dimensions with the Front Panel on the Right ...
Страница 118: ...Chapter 7 Installing the Switch on a Wall 118 ...
Страница 146: ...Chapter 8 Configuring Switches for Stacking 146 ...
Страница 158: ...Chapter 9 Cabling the Networking Ports 158 ...
Страница 164: ...Chapter 10 Replacing Modules 164 Figure 94 Tightening the Two Screws on the Line Card Blank Panel ...
Страница 169: ...AT x950 28XSQ Switch and VCStack Installation Guide 169 Figure 100 Installing the Blank Power Supply Cover ...
Страница 180: ...Chapter 11 Troubleshooting 180 ...
Страница 190: ...Appendix A Technical Specifications 190 ...