AT-x950-28XSQ Switch and VCStack Installation Guide
165
Replacing PWR600 AC Power Supplies
This section contains the procedure for removing or replacing PWR600
AC Power Supplies.The following illustrations show the removal of a
power supply from slot PSU A. The procedure is the same for slot PSU B.
Note
Allied Telesis recommends saving a backup copy of the
configuration file in the switch before removing or replacing power
supplies. For instructions, refer to the Software Reference for AT-
x950 Switches
.
To remove power supplies from the switch, perform the following
procedure:
1. Disconnect the AC power cord for the power supply from the AC power
source. Refer to Figure 95.
Figure 95. Disconnecting the AC Power Cord from the Power Source
2. Open the restraining strap on the power cord by pressing down on the
release tab and pulling out the strap. Refer to Figure 96 on page 166.
Содержание AT-x950-28XSQ
Страница 8: ...Contents 8 ...
Страница 12: ...Tables 12 ...
Страница 16: ...Preface 16 ...
Страница 62: ...Chapter 2 Virtual Chassis Stacking 62 ...
Страница 80: ...Chapter 3 Beginning the Installation 80 ...
Страница 90: ...Chapter 4 Installing Power Supplies and Optional XEM2 Line Card 90 ...
Страница 102: ...Chapter 6 Installing the Switch in an Equipment Rack 102 ...
Страница 106: ...Chapter 7 Installing the Switch on a Wall 106 Figure 67 Minimum Wall Area Dimensions with the Front Panel on the Right ...
Страница 118: ...Chapter 7 Installing the Switch on a Wall 118 ...
Страница 146: ...Chapter 8 Configuring Switches for Stacking 146 ...
Страница 158: ...Chapter 9 Cabling the Networking Ports 158 ...
Страница 164: ...Chapter 10 Replacing Modules 164 Figure 94 Tightening the Two Screws on the Line Card Blank Panel ...
Страница 169: ...AT x950 28XSQ Switch and VCStack Installation Guide 169 Figure 100 Installing the Blank Power Supply Cover ...
Страница 180: ...Chapter 11 Troubleshooting 180 ...
Страница 190: ...Appendix A Technical Specifications 190 ...