Chapter 8: Configuring Switches for Stacking
130
6. Designate the types of transceivers to be used in ports 25 to 37 with
the PLATFORM PORTMODE INTERFACE command, on both the
master switch and provisioned member switch. Allied Telesis
recommends performing this task at this time even if you are not using
these ports as the stack trunk.
7. Designate the ports of the stack trunk on both the master switch and
provisioned member switch, with the STACKPORT command in the
port Interface mode.
8. Save your changes with the WRITE command in the Privilege Exec
mode.
9. Reboot the switch with the REBOOT command.
10. Start a new local management session.
11. Verify the changes with the SHOW STACK and SHOW RUNNING-
CONFIG command.
Configuring the
Master Switch
To configure the master switch for stacking, perform the procedure in
Table 16.
Table 16. Configuring the Master Switch
Step
Description and Command
1
Power on the master switch and wait two minutes for it to initialize the management
software. Refer to “Powering On a Switch” on page 124.
2
Start a local management session on the switch. Refer to “Starting a Local
Management Session” on page 127.
3
Move to the Privileged Exec mode with the ENABLE command.
awplus> enable
4
Verify that the switch hardware is operating correctly by entering the SHOW SYSTEM
ENVIRONMENT command. The status of all components should be Ok.
awplus# show system environment
Environment Monitoring Status
Overall Status: Normal
Resource ID: 1 Name: PSU Bay A (AT-PWR600)
ID Sensor (Units)
Reading
Low Limit
High Limit
Status
1
Device Present
Yes
-
-
Ok
2
Fan/Temperature Fault
Yes
-
-
Ok
.
.
Содержание AT-x950-28XSQ
Страница 8: ...Contents 8 ...
Страница 12: ...Tables 12 ...
Страница 16: ...Preface 16 ...
Страница 62: ...Chapter 2 Virtual Chassis Stacking 62 ...
Страница 80: ...Chapter 3 Beginning the Installation 80 ...
Страница 90: ...Chapter 4 Installing Power Supplies and Optional XEM2 Line Card 90 ...
Страница 102: ...Chapter 6 Installing the Switch in an Equipment Rack 102 ...
Страница 106: ...Chapter 7 Installing the Switch on a Wall 106 Figure 67 Minimum Wall Area Dimensions with the Front Panel on the Right ...
Страница 118: ...Chapter 7 Installing the Switch on a Wall 118 ...
Страница 146: ...Chapter 8 Configuring Switches for Stacking 146 ...
Страница 158: ...Chapter 9 Cabling the Networking Ports 158 ...
Страница 164: ...Chapter 10 Replacing Modules 164 Figure 94 Tightening the Two Screws on the Line Card Blank Panel ...
Страница 169: ...AT x950 28XSQ Switch and VCStack Installation Guide 169 Figure 100 Installing the Blank Power Supply Cover ...
Страница 180: ...Chapter 11 Troubleshooting 180 ...
Страница 190: ...Appendix A Technical Specifications 190 ...