Chapter 6 – Engine removal / installation
Service manual AJP PR3/PR4 6 - 10
Assemble the battery holder with the
respective distance bushing in the upper
fixation;
Assemble the flange / record of the
connecting pipe to the secondary air pump (if
it exists).
Place the battery (first connecting cables / red
wires in the positive terminal and then the
black cables / wires in the negative in last
place);
Assemble the right front grill.
Install the drive chain onto the drive pinion
and assemble the drive pinion on the output
shaft;