Chapter 6 – Engine removal / installation
Service manual AJP PR3/PR4 6 - 1
SERVICE INFORMATION
Specifications
General
During removal and installation of the engine,
the motorcycle must be supported on a stand
or box, with the wheels on the ground / floor.
A jig or adjustable support is needed to
maneuver (disassemble / assemble) and
repair the engine.
The following components can be handled
with the engine installed on the frame:
Oil pump;
Timing chain/tensioner;
Clutch / star and gear selector, gear
lever;
Alternator (stator, magnetic flywheel
and start-up clutch).
The following components must be handled
with the engine out of the frame:
Cylinder head and valves;
Cylinder and piston;
Crankshaft;
Gearbox / forks / gears drum;
Kick start shaft.
Tightening torques
Shaft nut of the motor / swing arm:
93N.m
(9,5kgf.m)
Screw / nut of the connecting rod to the
frame / arm:
49N.m (5,0kgf.m)
Front engine fixing bolts (to the engine):
42N.m (4,3kgf.m)
Front engine fixing bolts (to the frame):
26N.m (2,7kgf.m)
Lower fixing screw of the beams:
39N.m
(
4,0kgf.m
)
Plate bolts to fix the drive pinion:
10N.m
(1,0kgf.m)
Drive pinion cover screws:
12N.m
(1,2kgf.m)
Gears pedal screw:
12N.m (1,2kgf.m)
Bolts and nuts fixing the oil cooler:
12N.m
(1,2kgf.m)
Nut on the starter cable:
8N.m (0,8kgf.m)
Nuts on the carburetor flange to the intake
nozzle:
10N.m (1,0kgf.m)
Screws of the inlet nozzle:
10N.m
(1,0kgf.m)
Crankcase protection screws:
12N.m
(1,2kgf.m)
SERVICE INFORMATION
6 – 1
ENGINE INSTALLATION
6 – 6
ENGINE REMOVAL
6 – 2
ENGINE START
6 – 11
ITEM
SPECIFICATION
125cm
3
200cm
3
240cm
3
Engine oil capacity
Change / Replace
1 Liter
1,1 Liters
1,1 Liters
Engine removal
1,1 Liters
1,2 Liters
1,2 Liters
Engine weight
29Kg
33,5Kg
34Kg