![ABB Relion 630 Series Скачать руководство пользователя страница 272](http://html.mh-extra.com/html/abb/relion-630-series/relion-630-series_technical-manual_2813272.webp)
•
All conditions for processing the must-shedding status hold good.
•
The overcurrent operate status for power source 1, that is,
OC_OPR_SRC1
is
FALSE.
•
The maximum demand operate status for power source 1, that is,
MAX_DMD_SRC1
is FALSE.
•
The external slow load-shed trigger for power source 1, that is,
EXT_SLT_SRC1
is FALSE.
If any of the above conditions is not satisfied, the power balance status is FALSE.
The logic is identical for processing the
PPLS2_DATA
input and its
power balance status and must-shedding status.
The processed inputs
PPLS1_DATA
and
PPLS2_DATA
are provided as
PEER1_DATA
and
PEER2_DATA
corresponding signal name for
PEER1_DATA
and
PEER2_DATA
.
Table 307:
The bits description for PEER1_DATA AND PEER2_DATA
Bit No
Signal name for PEER1_DATA
Signal name for PEER2_DATA
1
RCV_CB_STS1
RCV_CB_STS2
2
RCV_SR_STS1
RCV_SR_STS2
3
RCV_MS_STS1
RCV_MS_STS2
5 .. 29
RCV_LS_POW1
RCV_LS_POW2
30
RCV_CB_BLK1
RCV_CB_BLK2
31
LS_BLK_STS1
LS_BLK_STS2
The module provides the
PEER1_DATA
and
PEER2_DATA
to Source1/source2 LS
data handle module, Power monitoring module and Load shedding sharing mode
logic module.
7.7.4.4
Source1/source2 LS data handle
Based on the different conditions, the module calculates the compensated circuit
breaker status, island parallel status, fast load-shedding blocking status, circuit
breaker blocking status and fast load-shedding trigger for power source 1 and power
source 2.
Section 7
1MRS757256 F
Power management functions
266
PML630/Compact Load-Shedding Solution
Technical Manual
Содержание Relion 630 Series
Страница 1: ... RELION 630 SERIES Power Management PML630 Compact Load Shedding Solution Technical Manual ...
Страница 2: ......
Страница 26: ...20 ...
Страница 38: ...32 ...
Страница 202: ...196 ...
Страница 322: ...316 ...
Страница 360: ...354 ...
Страница 374: ...368 ...
Страница 376: ...370 ...