Cause of inhibition of sheddable load L1_INHIBIT output
A = input IED_QVAL_L1 is Bad
(within measurement cycle)
0
T
2T
3
T
4
T
5
T
L1_INHIBIT
0
1
L1_INHIBIT=”System inhibit”
1
0
A
GUID-8449C37E-29B5-4EEF-A469-85ACDDAD2EFD V1 EN
A = input IED_QVAL_L1 is Bad (at
measurement cycle)
0
T
2T
3
T
4
T
5T
L1_INHIBIT
0
1
L1_INHIBIT=”System inhibit”
1
0
A
GUID-B33FD3AD-5E3A-494F-AA05-CDB4556CA3C1 V1 EN
A = input IED_TEST_L1 is TRUE or
input EXT_INH_L1 is TRUE or input
CB_POS_L1 is Intermediate or
Invalid
L1_INHIBIT = System Inhibit
T, 2T, 3T are the measurement cycles.
If the sheddable load1 is inhibited by the system and operator at the
same time, the output
L1_INHIBIT
is "Operator Inhibit".
The calculated
L1_INHIBIT
output is available for the monitoring view and
reported to the Shed priority logic module.
7.5.4.4
Shed priority logic
This module calculates the shed priority of a sheddable load based on the system or
operator inhibition. The
Priority L1
setting sets the priority of the sheddable load1.
The
Priority L1
value ranges from 1 to 19, where 1 is the lowest important sheddable
load and 19 is the highest important sheddable load. The priority setting is also
available as the
L1_SHED_PRIO
output for the monitoring view.
The priority setting is effective only if the sheddable load is not
inhibited by the system or operator.
The priorities of the sheddable load1...5 can be monitored as output
PRIO_L1_5
and
sheddable load6...10 can be monitored as output
PRIO_L6_10
coded integer (32 bit)
form.
Each sheddable load priority is represented by 5-bit information as shown in
.
1MRS757256 F
Section 7
Power management functions
PML630/Compact Load-Shedding Solution
239
Technical Manual
Содержание Relion 630 Series
Страница 1: ... RELION 630 SERIES Power Management PML630 Compact Load Shedding Solution Technical Manual ...
Страница 2: ......
Страница 26: ...20 ...
Страница 38: ...32 ...
Страница 202: ...196 ...
Страница 322: ...316 ...
Страница 360: ...354 ...
Страница 374: ...368 ...
Страница 376: ...370 ...