4 Repair
4.6.6. Replacement of motor, axis 5, IRB 6640ID
353
3HAC026876-001 Revision: F
© Copyri
ght
200
7-2010 ABB.
All rights reserved.
Refitting, motor axis 5
The procedure below details how to refit the motor, axis 5.
Action
Note
1.
DANGER!
Turn off all electric power, hydraulic and
pneumatic pressure supplies to the robot!
For Foundry Prime robots:
Do not turn off the air pressure to motors and
SMB.
2. Make sure the o-ring on the circumference of the
motor is seated properly. Replace it if damaged.
Lightly lubricate the o-ring with grease.
Article numbers are specified in
Required equipment on page 351
.
3. In order to release the brakes, connect the 24
VDC power supply to the motor.
Connect to connector R3.MP5:
•
+ : pin C
•
- : pin D
4. Fit the motor, making sure the motor pinion is
properly mated to the gear of axis 5.
5. Secure the motor with the three attachment
screws and washers.
3 pcs: M8x25. Tightening torque: 24
Nm.
Dimensions of the tools are specified
in the figure
6. Disconnect the brake release and reconnect the
motor connectors.
.
7. Perform a leak-down test.
.
8. Refill the axis 5 gearbox with oil, if previously
drained.
Filling is detailed in section
9. Recalibrate the robot.
Calibration is detailed in a separate
calibration manual enclosed with the
calibration tools.
General calibration information is
included in the section
Calibration
information
.
10.
DANGER!
Make sure all safety requirements are met when
performing the first test run. These are further
detailed in the section
may cause injury or damage! on page 41
.
Continued
Содержание IRB 6640
Страница 2: ......
Страница 16: ...How to read the product manual 3HAC026876 001 Revision F 14 Copyright 2007 2010 ABB All rights reserved ...
Страница 438: ...4363HAC026876 001 Revision F Copyright 2007 2010 ABB All rights reserved ...
Страница 439: ......
Страница 440: ...ABB Robotics S 721 68 VÄSTERÅS SWEDEN Telephone 46 0 21 344000 3HAC 026876 001 Revision F en ...