3 Maintenance
3.3.8. Inspection, cable harness
3HAC026876-001 Revision: F
144
© Copyri
ght
200
7-2010 ABB.
All rights reserved.
Inspection, cable harness 1-4
The procedure below details how to inspect the cable harness of axes 1-4.
Action
Note
1.
DANGER!
Turn off all electric power, hydraulic and
pneumatic pressure supplies to the robot!
For Foundry Prime robots:
Do not turn off the air pressure to motors and
SMB.
2. Make an overall visual inspection of the cable
harness, in order to detect wear and damage.
3. Check the connectors at the base.
4.
NOTE!
If the robot is used in a Foundry Prime appli-
cation, check the cables for cracks in
insulation.
5. Check that velcro straps are properly attached
to the side bracket balancing cylinder.
NOTE!
For Cleanroom robots, check all cable
attachments as well as velcro straps.
Make sure the cable harness is properly
attached to the robot and isn’t damaged.
Location shown in the figure
cable harness, axes 1-4 on page 142
6. Replace the cable harness if wear, cracks or
damage is detected.
Detailed in section
cable harness, axes 1-6 on page 203
Detailed in section
cable harness, Cleanroom on page 224
.
Continued
Continues on next page
Содержание IRB 6640
Страница 2: ......
Страница 16: ...How to read the product manual 3HAC026876 001 Revision F 14 Copyright 2007 2010 ABB All rights reserved ...
Страница 438: ...4363HAC026876 001 Revision F Copyright 2007 2010 ABB All rights reserved ...
Страница 439: ......
Страница 440: ...ABB Robotics S 721 68 VÄSTERÅS SWEDEN Telephone 46 0 21 344000 3HAC 026876 001 Revision F en ...