4 Repair
4.3.6. Replacement of cable harness, axes 5-6 - IRB 6640ID
3HAC026876-001 Revision: F
248
© Copyri
ght
200
7-2010 ABB.
All rights reserved.
Cable layout, wrist unit
The figure below shows how to run and attach the cabling inside the wrist unit.
xx0500002014
Refitting, cable harness axes 5-6
The procedure below details how to refit the cable harness to the upper arm.
A
Location inside the wrist unit where to strap the cabling, next to the axis 5 motor.
Action
Note
1.
DANGER!
Turn off all electric power, hydraulic and
pneumatic pressure supplies to the robot!
For Foundry Prime robots:
Do not turn off the air pressure to motors and
SMB.
2. Make sure all the cable clamps and brackets are
attached properly to the new cable harness.
Spare part no. is specified in
Required equipment on page 246
.
3. Insert the cable harness through the upper arm
tube and pull out the motor connectors at the
wrist unit.
4. Secure the cable clamp (C) inside the upper arm
tube.
xx0500001904
Continued
Continues on next page
Содержание IRB 6640
Страница 2: ......
Страница 16: ...How to read the product manual 3HAC026876 001 Revision F 14 Copyright 2007 2010 ABB All rights reserved ...
Страница 438: ...4363HAC026876 001 Revision F Copyright 2007 2010 ABB All rights reserved ...
Страница 439: ......
Страница 440: ...ABB Robotics S 721 68 VÄSTERÅS SWEDEN Telephone 46 0 21 344000 3HAC 026876 001 Revision F en ...