4 Repair
4.7.2. Replacement gearbox axis 2
371
3HAC026876-001 Revision: F
© Copyri
ght
200
7-2010 ABB.
All rights reserved.
8.
DANGER!
Turn off all electric power,
hydraulic and pneumatic pressure
supplies to the robot!
For Foundry Prime robots:
Do not turn off the air pressure to
motors and SMB.
9. Remove the lower end of the
cable harness.
NOTE!
For Cleanroom robots the
procedure is detailed in section
Replacement of cable harness,
Cleanroom on page 224
10. Let the removed part of the cable
harness hang loose and take care
not to damage it during the
removal process.
11. Remove the attachment screws
M16x60 (12 pcs) securing the
lower arm to gearbox axis 2.
.
12. Remove the upper and lower arms
and put them down on the floor.
13. Remove motor axis 2.
Detailed in the section
.
14. Remove two attachment screws
(M12x60) parallel to each other.
15. Fit two guide pins in the holes,
parallel to each other.
16.
CAUTION!
The gearbox weighs 98 kg! All
lifting equipment used must be
sized accordingly!
Action
Note
Continued
Continues on next page
Содержание IRB 6640
Страница 2: ......
Страница 16: ...How to read the product manual 3HAC026876 001 Revision F 14 Copyright 2007 2010 ABB All rights reserved ...
Страница 438: ...4363HAC026876 001 Revision F Copyright 2007 2010 ABB All rights reserved ...
Страница 439: ......
Страница 440: ...ABB Robotics S 721 68 VÄSTERÅS SWEDEN Telephone 46 0 21 344000 3HAC 026876 001 Revision F en ...