
HVC
‐
PD
E
‐
Bus
Charger
Installation
Guide
Document: V1.2 / Document No.: 6AGA000008-0629-EN | Date: 06-30-2022 Page
42
of
146
4.2.3. Workflow with metal frame foundation
4.2.3.1. HPC175-HVC150 MET FOUND KIN 8IN – NAM (2CEB489802R0001)
1. Place the frame (A) in the desired position and mark the position of the holes for drilling.
2. Remove the frame.
3. Drill and tap holes at the marked positions. The holes must be suitable for bolt size M16.
4. Route the cables tray through one of the cable openings (B).
5. Align the frame (A) with the tapped holes.
6. Insert the bolts (C) fitted with the washers (D) into the holes (7x).
7. Tighten
the
bolts.
8. Route the AC power cable through the left cable opening (B). Make sure that a cable
length of 39.37 Inch is available above the floor for internal routing in the cabinet.
NOTICE
This extra cable length is required to connect the AC power cable with
the connectors in the Power Cabinet without problems.