6. Place the pantograph in the correct position, see also section
Instruction for pantograph
adjustment and alignment
on Page 97, by moving the pantograph over the C-profile (by
hand or with help of the present tensioning straps).
7. Lock the pantograph by tighten the M12 bolts (D) (4x) of the clamping plates (E).
NOTICE
The tensioning straps must not be removed after the pantograph has
been adjusted. Eventual corrections can still be made during
commissioning. The tensioning straps are removed after commissioning.
8. When removed, place back the cover plates (B) so that only the pantograph and the WiFi
antenna are free of access, and tighten the M6 bolts.
NOTICE
Additional cover plates are included in the supplied wooden crate. The
additional cover plates can be used to properly sealed the bottom side of
the horizontal frame of the Charge Pole,
after the pantograph has been
placed in the correct position.
8. Place back the U-profiles (A) on both side, and tighten the M6 bolts.
NOTICE
Make sure there are no cover plates directly under the WiFi
communication unit. This can disrupt the communication with the bus or
possibly make it impossible.