Transport
Arrangement for the delivery of the HVC-PD E-Bus Charger with the ABB Delivery
department. See
Contact information
on Page 14 for contact details. The delivery time
is at least four months.
4.2. Construct foundation of the Power Cabinet
4.2.1. Options
Use the correct foundation for the type of surface that the Power Cabinet will be installed on:
Soil
Use a concrete foundation to get a firm fixation on soil.
Concrete foundation cannot be ordered separately. It must be manufactured by
the
customer
. For detail drawings of the pre-fabricated concrete foundation see Appendix
E
Dimensions concrete foundation Power Cabinet
.
Solid floor
1. Use a metal frame foundation to guide the cables from the cabinet to the cable
duct. This foundation can be ordered separately. See section
Foundation for
Power Cabinet
on Page 20. For detail drawings see Appendix E
Dimensions
metal frame foundation Power Cabinet
.
2. The Power Cabinet is installed directly on a solid floor, through which the floor
is accessible from below (related to the feed through of the cables). For detail
drawings see Appendix A
Dimensions Power Cabinet
.
The cables must be embedded in the ground with a cable conduit. See section
Cabling
on
Page 49 and section
Civil installation
on Page 36.
NOTICE
It is advised to install traction wires into the conduits to install the
electrical cabling afterwards.
NOTICE
Be aware of the bending radius of the AC power input cables when using
the metal frame foundation. This metal frame foundation has a height of
7.09 Inch.