2.2.3. Communication glass fiber cable
The CAN/Ethernet communication between the Power Cabinet and Charge control set is done
via a glass fiber cable. This glass fiber cable must be prefabricated and can be ordered
separately.
Cable length must be defined by the contractor performing installation during site survey.
A Protection tube for routing the cable through the conduit
B Metal finish tulle (clamping area: Ø 0.79 Inch, length 1.97 – 3.15 Inch)
C Individual optical fibers (length is 59.10 Inch)
Amount
Part number
Description
1
OM3 or greater, prefabricated
OM3, PCF or fiberglass (multimode, 850 nm) optic cable with
8 fibers (4 for spare), with B-FCO(ST
®
) connectors for each
cable.
If glass fiber cable is not supplied by ABB, then gland dimensions listed in section Gland
layout of the ACS Control Module on Page 106 must be followed. Please note that special
precautions should be taken, so that prefabricated fiber optic cable will pass through the
gland (for example order cable with M32 gland assembled on it). Another alternative could
be to crimp the fiber optic cable on the site after passing through the gland.
NOTICE
Cable length must be defined by the contractor performing installation
during site survey.