
HVC
‐
PD
E
‐
Bus
Charger
Installation
Guide
Document: V1.2 / Document No.: 6AGA000008-0629-EN | Date: 06-30-2022 Page
21
of
146
Metal frame foundation
The metal frame foundation can be used to install the Power Cabinet on a solid surface. It also
used to provide more cable training and side entry.
A Foundation
B Front border cover
C Rear border cover
Amount
Part number
Description
1
2CEB489802R0001
HPC175-HVC150 MET FOUND KIT 8IN - NAM
2.2.2. Foundation for Charge pole construction
Concrete foundation
The concrete foundation can be used to install the Charge pole construction on soil.
NOTICE
No charge pole foundation in NA. Designs are available in Appendix G
and must be manufactured by installer, not manufactured by ABB.
A Base
plate
B Counter
weights