2.3. Project planning
Careful project planning is necessary before a HVC-PD E-Bus Charger is purchased and put
into operation. The different phases of the full project plan are shown in the figure below:
A. Preparation
The owner / site operator has ordered a HVC-PD E-Bus Charger. In this phase all
preparation work must be done before the contractor can do the civil and electrical
works. See
About preparation
on Page 25.
B. Construction
The contractor does all civil and electrical works. See
About construction
on Page 38.
C. Placement and Connection
The location is mechanically and electrically ready to receive the HVC-PD E-Bus
Charger. See
About placement and connection
on Page 54.
D. Commissioning
The delivery department will bring the HVC-PD E-Bus Charger into operation. See
Commissioning preparation
on Page 121.
E. Service and Maintenance
The HVC-PD E-Bus Charger is in operation. There are various options for service and
maintenance. See
About Service and Maintenance
on Page 123.