
HVC
‐
PD
E
‐
Bus
Charger
Installation
Guide
Document: V1.2 / Document No.: 6AGA000008-0629-EN | Date: 06-30-2022 Page
20
of
146
View of the pantograph
A Base
frame
B Lower
arm
C Lower guide rod
D Upper
arm
E Collector head guidance
F Tension
spring
G Collector
head
2.2. Accessories
The following parts can be ordered at the time of the initial order or afterwards. Contact ABB
Sales department (see
Contact information
on Page 14 for contact details).
2.2.1. Foundation for Power Cabinet (for reference only)
Concrete foundation
NOTICE
Concrete foundations for power cabinet are not sold in NA. Designs are
available in Appendix E and must be manufactured by installer, not
manufactured by ABB.
A Foundation
B Top cover plate
C Front
cover
plate