
HVC
‐
PD
E
‐
Bus
Charger
Installation
Guide
Document: V1.2 / Document No.: 6AGA000008-0629-EN | Date: 06-30-2022 Page
123
of
146
7.
Service and Maintenance
7.1. About Service and Maintenance
E
Service and Maintenance
Maintenance is done according the maintenance schedule. This is outside of the scope
of this document.
DANGER
Any service and maintenance work on pantograph and or charger system
has to be only executed on powered-off device.
Make sure that the main switch of the power supply group for the product
is set to the OFF position. Do a voltage check to make sure that the
electrical power is disconnected from the system. Secure against
resetting.
7.2. Cleaning of the cabinet
The Power Cabinet and Charge pole is powder coated. This coating must be kept in good
condition.
Clean the Power Cabinet and Charge pole three times a year in the following way:
Remove rough dirt by spraying with low-pressure tap water.
Apply a neutral or weak alkaline cleaning solution and let it soak.
Remove dirt by hand with a non-woven nylon hand pad.
Rinse thoroughly with tap water.
Optionally, apply wax on the front for extra protection and gloss.
Do a check on the coating for damage.