Page
21
of
44
3DGence Material Management System | version 1 | 03.2022
Fig. 15 Rear of the device - how to install the communication cable
5.
Screw the bottom beam (highlighted in blue in the figure below) at 4 points, connecting the two devices.
Fig. 16 Rear of the device - how to install the bottom beam
6.
Screw the top beam (highlighted in blue in the figure below) at 4 points, at the same time laying the communication
cable so that it runs in the centre of the top beam. The top beam has special notches which allow the communication
cable to be led out on both sides.
Fig. 17 Rear of the device - how to install the top beam