Page
13
of
44
3DGence Material Management System | version 1 | 03.2022
3.
UNPACKING THE MMS
The device may be commissioned if, after installation, it complies with all recommendations contained in the manual and is
free from damage and defects that may affect its safe operation. The operator of the machine must be familiar with the
operating manual.
During transport, the 3DGence Material Management System is secured to the pallet with straps and protected with
cardboard packaging. The pallet on which the device is placed is an euro 1 pallet with dimensions 1200 x 800 mm.
Caution:
due to the considerable weight of the device (~200 kg alone), special care must be taken when unpacking.
4.
STEPS BEFORE STARTING THE DEVICE
Note:
Before starting the printer for the first time, the manufacturer recommends that the device is left for 2 hours
before being connected to a power source in order to stabilise the temperature.
Note:
before starting the device for the first time, select an appropriate installation site, observing the
recommendations and requirements described in this manual.
Before starting the MMS each time:
•
check the cables for chafing or other visible damage. If the cables are damaged, please inform the 3DGence technical
support department immediately. It is also forbidden to connect the device to the power supply and/or undertake repairs
on your own,
•
check that there are no objects or loose parts in the device chambers that could cause jamming or damage to the heating
elements.
5.
START-UP 3DGENCE MATERIAL MANAGEMENT SYSTEM
5.1.
Connecting to power source and switching on the device
Once the device is correctly positioned and the transport castors are locked, connect the device to the power source. The
power cable inlet is located at the rear of the device.
5.2.
Preparing the device chambers for operation
Each device is supplied with the appropriate number of drying cartridges and material storage drawers. A regeneration cycle
for the desiccant cartridges must be carried out before full operation of the device. The desiccant cartridge regeneration cycle
is described in Chapter V of this manual. After regenerating the desiccant cartridges, it is necessary for each chamber:
1.
Make sure that there is no high temperature (below 60°C) in the chambers.
2.
Open the chamber door.
3.
Insert the material drawer with the notch towards the chamber door.
4.
Insert the regenerated desiccant cartridge into the drawer notch.
5.
Close the chamber door.
5.3
Connecting the WLAN adapter
The accessories supplied with the device include a WLAN adapter that enables wireless communication with the device.
1.
Plug one end of the supplied WLAN cable into the WLAN module.
2.
Plug the other end of the WLAN cable into the LAN socket on the device
3.
Position the WLAN module close to the device. It will be fixed with a magnet.