5-4
Figure 5-5
Set the terminal type
Power-On of the Device
Checklist Before Device Power-On
Before powering on the device, check that:
z
The power cord and ground cable are correctly connected.
z
The voltage of the power source conforms to voltage requirement of the device.
z
The console cable is correctly connected, the configuration terminal or PC is powered on, and the
emulation program is properly configured.
z
If an external CF card is needed to store applications, the CF card is properly installed.
Powering On the Device
Step1
Turn on the power source.
Step2
Turn on the power switch on the device.
Checklist/Operations After Power-On
After powering on the device, check that:
1) The LEDs on the front panel are normal.
The following table describes normal LED states after the device is powered on.
Содержание SECPATH U200-CS
Страница 64: ...5 9 Figure 5 7 Web interface for the U200 M ...