ZCC1100H Crawler Crane
CAUTION
(1) The values in bold
are the lifting capacity determined by the strength of the machine,
while the values that are not in bold are the lifting capacity determined by the
stability of the machine.
(2) Do not lift a load in the area which is not in the lifting capacity range, otherwise the
crane may topple over or be damaged.
(3) The value in the chart is the maximum lifting capacity of the crane, including the
weight of lifting device, hook, wire rope at the end of the hook and so on.
(4) The value in the chart is the lifting capacity of the crane without a tip boom. When
main boom is fitted with tip boom, the lifting capacity must include the weight of
main load hook, wire rope, lifting device as well as the weight of tip boom, auxiliary
hook, and wire rope.
For reference only.
Operators manual should be consulted and adhered to.
Summary of Contents for ZCC1100
Page 2: ...For reference only Operators manual should be consulted and adhered to...
Page 4: ...For reference only Operators manual should be consulted and adhered to...
Page 6: ...For reference only Operators manual should be consulted and adhered to...
Page 12: ...For reference only Operators manual should be consulted and adhered to...
Page 14: ...For reference only Operators manual should be consulted and adhered to...
Page 22: ...For reference only Operators manual should be consulted and adhered to...
Page 80: ...For reference only Operators manual should be consulted and adhered to...
Page 82: ...For reference only Operators manual should be consulted and adhered to...
Page 140: ...For reference only Operators manual should be consulted and adhered to...
Page 206: ...For reference only Operators manual should be consulted and adhered to...