Assembly
and
Dism
antling
5-73
Table 5-17
Components used to assemble fixed jib
No.
Names of the
components
Illustration
1
Pin spindle
(114mm)
4.49"
(6
0mm)
2.
36"
2
Retaining plate
(82mm)
3.23"
1.
1"
(2
8mm)
3
Washer
DIN 137
(12)
4
Bolt
ISO 4017:1999
(M12X45-8.8)
5
Double tapered
pin
5.12"
(130mm)
1.
18"
(30m
m
)
6
Retaining spring
(85mm)
3.35"
d) Assemble main boom anchoring rods according to the length of assembled main boom
(for the details, see Section 5.4.1);
Pre-assemble some fixed jib rear anchoring rods to FA-frame according to the required
angle of fixed jib (for the details, see Section 5.4.2.2).
Connect fixed jib front anchoring rods according to the length of assembled fixed jib (for
the details, see Section 5. 4.2.2).
For reference only.
Operators manual should be consulted and adhered to.
Summary of Contents for ZCC1100
Page 2: ...For reference only Operators manual should be consulted and adhered to...
Page 4: ...For reference only Operators manual should be consulted and adhered to...
Page 6: ...For reference only Operators manual should be consulted and adhered to...
Page 12: ...For reference only Operators manual should be consulted and adhered to...
Page 14: ...For reference only Operators manual should be consulted and adhered to...
Page 22: ...For reference only Operators manual should be consulted and adhered to...
Page 80: ...For reference only Operators manual should be consulted and adhered to...
Page 82: ...For reference only Operators manual should be consulted and adhered to...
Page 140: ...For reference only Operators manual should be consulted and adhered to...
Page 206: ...For reference only Operators manual should be consulted and adhered to...