
Operator’s Manual for Crawler Crane
D
e
s
c
rip
tio
n
o
f
Cra
n
e
Operator’s Manual for Crawler Crane
ZCC1100H Crawler Crane
2-15
2.4.2 Specification of load hook and selection of rope reeving
There are four types of load hooks available for ZCC1100H crawler crane. In actual operation,
choose appropriate load hook according to the weight of load and the length of boom.
Table 2-6 Hook information
Specification of load
hook (UST/t)
Number of
pulleys
Maximum rope reeving
Weight of load hook
(lbs/kg)
110/100
5
10
3352/1520
55/50
3
7
2712/1230
33/30
3
7
1720/780
8.8/8
No
1
595/270
CAUTION
The specification of load hook in above table is not the standard load hook configuration.
It is subject to the contract signed with the customer.
2.4.3 Performance of wire rope and winch
2.4.3.1 Hoisting rope reeving
Under crane operation with main boom, maximum hoisting rope reevings for different boom
lengths are shown in the table 2-7. When crane is working with fixed jib, the hoisting rope
reeving is 1.
Table 2-7 Hoisting rope reeving and wire rope length in main boom configuration
Length of
main boom
ft(m)
Reeving
Length of wire
rope needed ft(m)
Length of
main boom
ft(m)
Reeving
Length of wire
rope needed ft(m)
42’8”(13)
10
541’2”(165)
141
’2”(43)
3
600’2”(183)
52’6”(16)
10
646’2”(197)
150’11”(46)
3
636’4”(194)
62’4”(19)
9
685’6”(209)
160’10”(49)
3
675’8”(206)
72’3”(22)
8
705’2”(215)
170’8”(52)
3
715’(218)
82’(25)
7
708’6’(216)
180’5”(55)
2
570’8”(174)
91’11”(28)
6
688’9”(210)
190’4”(58)
2
600’2”(183)
101’9”(31)
5
652’8”(199)
200’2”(61)
2
629’9”(192)
111’6”(34)
5
711’9”(217)
210’(64)
2
659’3”(201)
121’5”(37)
4
646’2”(197)
219’10”(67)
2
688’9”(210)
131’3”(40)
4
695’4”(212)
For reference only.
Operators manual should be consulted and adhered to.
Summary of Contents for ZCC1100
Page 2: ...For reference only Operators manual should be consulted and adhered to...
Page 4: ...For reference only Operators manual should be consulted and adhered to...
Page 6: ...For reference only Operators manual should be consulted and adhered to...
Page 12: ...For reference only Operators manual should be consulted and adhered to...
Page 14: ...For reference only Operators manual should be consulted and adhered to...
Page 22: ...For reference only Operators manual should be consulted and adhered to...
Page 80: ...For reference only Operators manual should be consulted and adhered to...
Page 82: ...For reference only Operators manual should be consulted and adhered to...
Page 140: ...For reference only Operators manual should be consulted and adhered to...
Page 206: ...For reference only Operators manual should be consulted and adhered to...