
Operator’s Manual for Crawler Crane
Assembly
and
Dismantli
ng
5-76
5.6.3
Electrical connection to fixed jib
5.6.3.1 Wire layout of fixed jib
Mounting position of electrical parts on fixed jib is shown in the figure 5-68:
Figure 5-68 Wire layout of fixed jib
Description of electrical parts is shown in table 5-18:
Table 5-18 Functions of electrical parts
No.
Names of the
components
Instructions
1
Fixed jib junction box
Connect to various electrical parts on fixed jib head
2
Anemometer and warning
light on the boom head
Measure the wind speed and send a warning in the air
3
hoisting limit switch for H2
winch
Prevent winch 2 from over hoisting
After the installation of main boom and fixed jib, pull the cable plug of fixed jib cable drum (part
2 in figure 5-60) along the boom frame to the fixed jib head, and then connect it with fixed jib
junction box (part 1 in figure 5-68). Bind the cable with chains. Dismantle the warning light on
the boom head, anemometer, hoisting limit switch for winch 2, and install them on
corresponding positions on fixed jib head. The wire layout of fixed jib function box is shown in
figure 5-69:
1
2
3
For reference only.
Operators manual should be consulted and adhered to.
Summary of Contents for ZCC1100
Page 2: ...For reference only Operators manual should be consulted and adhered to...
Page 4: ...For reference only Operators manual should be consulted and adhered to...
Page 6: ...For reference only Operators manual should be consulted and adhered to...
Page 12: ...For reference only Operators manual should be consulted and adhered to...
Page 14: ...For reference only Operators manual should be consulted and adhered to...
Page 22: ...For reference only Operators manual should be consulted and adhered to...
Page 80: ...For reference only Operators manual should be consulted and adhered to...
Page 82: ...For reference only Operators manual should be consulted and adhered to...
Page 140: ...For reference only Operators manual should be consulted and adhered to...
Page 206: ...For reference only Operators manual should be consulted and adhered to...