
Operator’s Manual for Crawler Crane
Operator’s Manual for Crawler Crane
Assembly
and
Dism
antling
5-69
Figure 5-62 Raising main boom
CAUTION
(1) Always monitor the wire rope in process of raising main boom to make sure that the
wire rope on boom head is kept in the rope groove all the time.
(2) Before main boom is raised to 30° position, make sure that the hook is in contact
with the ground. After main boom is raised to 30° position, the hook can be lifted
away from the ground.
(3) The boom-raising movement should be performed slowly and stably. And during the
operation, the crane operator must observe the data shown on the screen, while
other workers should pay attention to environmental changes.
(4) Standing beneath the boom frame is prohibited.
(5) Working radius stipulated in the load capacity charts should be adhered to, even if
no load is attached on the load hook! If this is not observed, the crane may topple
over!
For reference only.
Operators manual should be consulted and adhered to.
Summary of Contents for ZCC1100
Page 2: ...For reference only Operators manual should be consulted and adhered to...
Page 4: ...For reference only Operators manual should be consulted and adhered to...
Page 6: ...For reference only Operators manual should be consulted and adhered to...
Page 12: ...For reference only Operators manual should be consulted and adhered to...
Page 14: ...For reference only Operators manual should be consulted and adhered to...
Page 22: ...For reference only Operators manual should be consulted and adhered to...
Page 80: ...For reference only Operators manual should be consulted and adhered to...
Page 82: ...For reference only Operators manual should be consulted and adhered to...
Page 140: ...For reference only Operators manual should be consulted and adhered to...
Page 206: ...For reference only Operators manual should be consulted and adhered to...