5.9 Transport means and safety precautions for transport
5.9.1
Safety precautions for transport
a) After crawler crane is dismantled, it can be transported by a low-loader, train or by other
transport equipment for a long distance. During transportation, the crane is fixed by rope,
with its doors and windows locked up. If necessary, take preventive measures against rain.
The crawler crane should be dismantled and transported in accordance with the
permissible load carrying capacity of transport vehicle, the weight, dimensions of
dismantled parts which are shown in previous figures, and the local traffic laws and
regulations. The transport vehicle is forbidden to be overloaded. The weights and
dimensions of dismantled parts to be transported can refer to
Package and Transport
Manual.
b) During transportation, all component parts should be fixed to prevent them from collision
and sliding.
c)
The counterweight anchoring rod on A-frame and the rear anchoring rod of A-frame should
be secured on the rear end of slewing table.
d) To understand the detailed transport means, please consult our company.
5.9.2 Other requirements
If the crane is not put into use for a long time (over 6 months), take the following protective
measures.
a) Wipe off the dust and oil dirt to keep the crane clean.
b) Retract all the piston rods of the cylinders completely.
c)
Put the battery in a dry and ventilating place and charge it periodically.
d) Grease the surfaces of all exposed components to prevent them from corroding.
e) Clean the wire ropes and grease them again with ZG-3 graphite calcium base grease.
f)
Store the crane in a garage. If it is placed in the open air, it must be covered up with a
water-proof cloth to prevent it from corroding, and antifreeze measure should be taken in
winter.
g) Start the machine once a month and run all the working mechanisms with no load to check
whether they are in good condition.
h) Assign a person responsible for completeness of the crane so that it can be put into
operation at any time.
CAUTION
If the crane is not used for a long time, the operator must make a complete and correct
check for the crane before stating it up again.
For reference only.
Operators manual should be consulted and adhered to.
Summary of Contents for ZCC1100
Page 2: ...For reference only Operators manual should be consulted and adhered to...
Page 4: ...For reference only Operators manual should be consulted and adhered to...
Page 6: ...For reference only Operators manual should be consulted and adhered to...
Page 12: ...For reference only Operators manual should be consulted and adhered to...
Page 14: ...For reference only Operators manual should be consulted and adhered to...
Page 22: ...For reference only Operators manual should be consulted and adhered to...
Page 80: ...For reference only Operators manual should be consulted and adhered to...
Page 82: ...For reference only Operators manual should be consulted and adhered to...
Page 140: ...For reference only Operators manual should be consulted and adhered to...
Page 206: ...For reference only Operators manual should be consulted and adhered to...