
Operator’s Manual for Crawler Crane
Assembly
and
Dismantli
ng
5-42
5.4.1.2 Combination of main boom anchoring rods
Now, we will illustrate the connecting methods for 219'10" (67m) main boom anchoring rods.
Please see the figure 5-42.
1
2
3
4
8
9
5
6
7
(7)
(7)
22
'3
''(
57
00
m
m
)
8'
10
''(2
70
0m
m
)
10
''(
27
0m
m
)
22’3''(700mm)
6x
29
'6
''(
=
17
7'
1''
)(
6x
90
00
m
m
)
19
'8
''(
60
00
m
m
)
9'1
0'
'(3
00
0m
m
)
10
''(
27
0m
m
)
22
'3
''(
57
00
m
m
)
Figure 5-42 Combination of 219'10" (67m) main boom anchoring rods
To main boom head
To derricking
pulley block
For reference only.
Operators manual should be consulted and adhered to.
Summary of Contents for ZCC1100
Page 2: ...For reference only Operators manual should be consulted and adhered to...
Page 4: ...For reference only Operators manual should be consulted and adhered to...
Page 6: ...For reference only Operators manual should be consulted and adhered to...
Page 12: ...For reference only Operators manual should be consulted and adhered to...
Page 14: ...For reference only Operators manual should be consulted and adhered to...
Page 22: ...For reference only Operators manual should be consulted and adhered to...
Page 80: ...For reference only Operators manual should be consulted and adhered to...
Page 82: ...For reference only Operators manual should be consulted and adhered to...
Page 140: ...For reference only Operators manual should be consulted and adhered to...
Page 206: ...For reference only Operators manual should be consulted and adhered to...