Operator’s Manual for Crawler Crane
Operator’s Manual for Crawler Crane
Assembly
and
Dism
antling
5-47
5.4.1.3 Installation of intermediate tensioner
Under main boom configuration, when main boom length is 210' (64m) or 219'10" (67m), the
intermediate tensioner must be fitted.
At this time, 9m main boom intermediate section A (code: G15A, length: 29'6") must be used.
Its position is shown in the figure 5-44.
G12
G15A
G15
Figure 5-44 Position of 9m main boom intermediate section A
Installation of intermediate tensioner is shown as follows:
10.63''(270mm)
1’10’’(560mm)
9''(230mm)
3'5''(1060mm)
2’
3’
’(
70
0m
m
)
1
2
3
4
5
6
(5)
Figure 5-45 Installation of intermediate tensioner
The component numbers in the figure 5-45 will be described in the table 5-10.
T
o m
ai
n
b
oo
m
T
o
an
c
hor
ing
rods
For reference only.
Operators manual should be consulted and adhered to.
Summary of Contents for ZCC1100
Page 2: ...For reference only Operators manual should be consulted and adhered to...
Page 4: ...For reference only Operators manual should be consulted and adhered to...
Page 6: ...For reference only Operators manual should be consulted and adhered to...
Page 12: ...For reference only Operators manual should be consulted and adhered to...
Page 14: ...For reference only Operators manual should be consulted and adhered to...
Page 22: ...For reference only Operators manual should be consulted and adhered to...
Page 80: ...For reference only Operators manual should be consulted and adhered to...
Page 82: ...For reference only Operators manual should be consulted and adhered to...
Page 140: ...For reference only Operators manual should be consulted and adhered to...
Page 206: ...For reference only Operators manual should be consulted and adhered to...