
Operator’s Manual for Crawler Crane
Assembly
and
Dismantli
ng
5-14
5.2.2.4 Assembly of right crawler carrier
The process of assembling right crawler carrier:
a) Confirm that left crawler carrier is in contact with the ground (see the figure 5-14). At this
time, the crane is inclined slightly, and the superstructure can slew freely.
b) Lift right crawler carrier from the low-loader, and assemble it onto the undercarriage
central section by use of mounting cylinder and main boom pivot section. If necessary, use
right horizontal cylinder to assemble crawler carrier.
c)
Adjust the height of support cylinder to allow left and right crawler carriers to contact the
ground. Extend right horizontal cylinder to working position.
Figure 5-14 Assembly of right crawler carrier
DANGER
When only one crawler carrier is attached on the crane, the operator must first make this
crawler carrier come into contact with the ground, and then slew the tail end of slewing
table above the crawler carrier. Otherwise, serious injury or property damage will occur.
For reference only.
Operators manual should be consulted and adhered to.
Summary of Contents for ZCC1100
Page 2: ...For reference only Operators manual should be consulted and adhered to...
Page 4: ...For reference only Operators manual should be consulted and adhered to...
Page 6: ...For reference only Operators manual should be consulted and adhered to...
Page 12: ...For reference only Operators manual should be consulted and adhered to...
Page 14: ...For reference only Operators manual should be consulted and adhered to...
Page 22: ...For reference only Operators manual should be consulted and adhered to...
Page 80: ...For reference only Operators manual should be consulted and adhered to...
Page 82: ...For reference only Operators manual should be consulted and adhered to...
Page 140: ...For reference only Operators manual should be consulted and adhered to...
Page 206: ...For reference only Operators manual should be consulted and adhered to...