
2 - 24
SPEC
CABLE ROUTING DIAGRAM
Ò
Fasten the starter cable,
thermo switch lead, CDI unit
lead, main switch lead, start
switch lead and engine stop
switch lead.
Ó
Fasten the wire harness, CDI
unit leads, thermo switch lead
and CDI magneto lead.
Ô
Pass the carburetor heater
lead between the carburetor
breather hose and air intake
duct.
Õ
Position the main switch cou-
pler between the carburetor
breather hose and air intake
duct.
Ö
Fasten the start switch lead,
main switch lead and engine
stop switch lead at the tape
with the plastic locking tie.
×
Fasten the battery leads.
Ø
Fasten the wire harness and
starting circuit cut-off relay lead
at the tape for the wire harness
with the plastic locking tie.
Ù
Fasten the rectifier/regulator
lead and starter relay leads.
For fastening, pass the plastic
locking tie through the hole in
the battery box.
A
A
A
C
C
D
B
B
B
B
F
F
F
E
E
D
A - A
B - B
E - E
C
F - F
G - G
D
K
K
Q
R
Ñ
8
E
H
Ô
2
3
4
6
5
4
3
2
1
J
I
H
G
F
E
D C
B
A
0
Í
9
8
Ë
K
7
S
W
U V
A
0
Ú
T
9
9
Q
P
P
T
9
Ò
Ó
Õ
Ö
Ê
É
È
Ï
Ø
Ù
E
G
G
A
P
O
N
M
L
9
Ð
9
Î
Û
Ý
25 mm (1.0 in)
×
Ì
35 ~ 45 mm
(1.38 ~ 1.77 in)
30 ~ 40 mm
(1.18 ~ 1.57 in)
Ü
Summary of Contents for TT-R90(V)
Page 45: ...GEN INFO MEMO...
Page 111: ...2 18 SPEC MEMO...
Page 137: ...INSP ADJ MEMO...
Page 345: ...ELEC MEMO...
Page 357: ...ELEC MEMO...
Page 373: ...ELEC MEMO...
Page 379: ...ELEC MEMO...
Page 389: ......