4 - 67
ENG
CLUTCH
EBS00309
INSTALLING THE CLUTCH
1. Install:
• clutch carrier assembly
• nut
1
CAUTION:
The clutch carrier assembly nut has left-
handed threads. To tighten the clutch car-
rier assembly nut turn it counterclockwise.
NOTE:
Use a clutch holding tool
2
to hold the clutch
carrier assembly.
2. Lock the threads with a drift punch.
Universal clutch holder
90890-04086, YM-91042
New
T
R
.
.
190 Nm (19.0 m · kg, 140 ft · lb)
3. Install:
• one-way clutch bearing
NOTE:
_
The one-way clutch bearing should be
installed in the clutch carrier assembly with the
“OUT SIDE” mark
a
facing toward the clutch
housing.
4. Install:
• dowel pins
• gasket
• clutch housing assembly
NOTE:
_
• Tighten the bolts in stages, using a criss-
cross pattern.
• After tightening the bolts, check that the
clutch housing assembly rotates smoothly.
New
T
R
.
.
10 Nm (1.0 m · kg, 7.2 ft · lb)
Summary of Contents for GRIZZLY 700 FI YFM7FGPW
Page 1: ...LIT 11616 20 11 3B4 28197 10 YFM7FGPW SERVICE MANUAL ...
Page 47: ...2 11 SPEC ENGINE SPECIFICATIONS Cylinder head tightening sequence 3 1 4 2 7 8 5 6 ...
Page 274: ...6 2 FI FUEL INJECTION SYSTEM 6 ...
Page 482: ...10 7 TRBL SHTG ...
Page 484: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN PRINTED IN U S A ...