7 - 16
DRIV
FRONT CONSTANT VELOCITY JOINTS AND
DIFFERENTIAL GEAR
EBS00177
CHECKING THE DIFFERENTIAL GEAR
OPERATION
1. Block the rear wheels, and elevate the front
wheels by placing a suitable stand under
the frame.
2. Remove the wheel cap from the axle nut
(right or left).
3. Measure the starting torque of the front
wheel (i.e., differential gear preload) with
the torque wrench.
NOTE:
_
• Repeat this step several times to obtain an
average figure.
• During this test, the other front wheel will turn
in the opposite direction.
4. Out of specification
→
Replace the differen-
tial gear assembly.
5. Within specification
→
Install the new cotter
pin and wheel cap.
T
R
.
.
Front wheel starting torque
(differential gear preload)
New unit
17 ~ 25 Nm
(1.7 ~ 2.5 m · kg, 12 ~ 18 ft · lb)
Minimum
10 Nm (1.0 m · kg, 7.2 ft · lb)
Summary of Contents for GRIZZLY 700 FI YFM7FGPW
Page 1: ...LIT 11616 20 11 3B4 28197 10 YFM7FGPW SERVICE MANUAL ...
Page 47: ...2 11 SPEC ENGINE SPECIFICATIONS Cylinder head tightening sequence 3 1 4 2 7 8 5 6 ...
Page 274: ...6 2 FI FUEL INJECTION SYSTEM 6 ...
Page 482: ...10 7 TRBL SHTG ...
Page 484: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN PRINTED IN U S A ...