2-26
INSP
ADJ
POWER TRAIN
SHEAVE OFFSET ADJUSTMENT
1. Remove:
• Left side cover
• Drive guard
Refer to “COVERS” in CHAPTER 3.
2. Remove:
• Drive V-belt
3. Measure:
• Sheave offset
a
Use a straightedge that is approximately
470 mm (18.5 in) long, 20 mm (0.79 in) wide,
and 4 mm (0.16 in) thick.
Out of specification
→
Adjust.
NOTE:
Push the secondary sheave inward towards the
frame, and then measure the sheave offset.
Sheave offset:
13.5 ~ 16.5 mm (0.53 ~ 0.65 in)
4. Adjust:
• Sheave offset
Adjustment steps:
• Apply the brake to lock the secondary sheave.
• Remove the secondary sheave bolt
1
, washer
2
, shim(s) (left), and secondary sheave
3
.
• Install the appropriate shim(s) (right)
4
from the
following table so that the sheave offset is within
specification.
Shim size
Part number
Thickness
90201-286K9
1.0 mm (0.04 in)
1
2
3
4
Summary of Contents for FX10X 2008
Page 2: ......
Page 312: ...7 36 FI ...
Page 333: ...8 21 ELEC CHARGING SYSTEM ...
Page 341: ...8 29 ELEC LIGHTING SYSTEM ...
Page 404: ...9 43 SPEC CABLE ROUTING 9 1 2 3 4 5 6 6 7 7 8 ...
Page 406: ......
Page 407: ......