4-8
POWR
TR
PRIMARY SHEAVE AND DRIVE V-BELT
• Tighten the spider to specification using the bar
wrench
3
.
CAUTION:
The spider has a left-handed thread.
WARNING
• Do not operate the primary sheave until the
LOCTITE
®
has dried completely. Wait 24
hours before operating the primary sheave.
• Since a high torque is required to tighten the
spider, make sure the spider, fixed sheave,
and special tool are well secured. Tighten the
spider carefully to prevent cracks and dam-
age to the sheaves and spider.
Clutch spider separator (bar
wrench):
90890-01711, YS-28890-C
T
R
.
.
Spider:
200 Nm (20.0 m · kg, 145 ft · lb)
5. Install:
• Weight
• Bolts
1
• Nuts
2
• Set bolts
3
NOTE:
To maintain the primary sheave balance, the bolts
1
must be installed with their threaded portions
pointing in a counterclockwise direction, as illus-
trated.
T
R
.
.
Nut:
6 Nm (0.6 m · kg, 4.3 ft · lb)
Set bolt:
4 Nm (0.4 m · kg, 2.9 ft · lb)
LOCTITE
®
2
3
LT
1
1
Summary of Contents for FX10X 2008
Page 2: ......
Page 312: ...7 36 FI ...
Page 333: ...8 21 ELEC CHARGING SYSTEM ...
Page 341: ...8 29 ELEC LIGHTING SYSTEM ...
Page 404: ...9 43 SPEC CABLE ROUTING 9 1 2 3 4 5 6 6 7 7 8 ...
Page 406: ......
Page 407: ......