5-71
ENG
INSPECTION
1. Measure:
• Crankshaft runout
Use the V-blocks and a dial gauge.
Out of specification
→
Replace the crank-
shaft.
Dial gauge:
90890-03097
Dial indicator gauge:
YU-A8428
Crankshaft runout:
0.03 mm (0.0012 in)
2. Inspect:
• Crankshaft journal surfaces
• Crankshaft pin surfaces
• Bearing surfaces
Scratches/wear
→
Replace the crankshaft.
3. Inspect:
• Bearings
Clean and lubricate the bearings, then rotate
the inner race with your finger.
Rough movement
→
Replace.
4. Inspect:
• Balancer drive gear
• Balancer driven gear
Damage/wear
→
Replace the crankshaft
assembly and balancer driven gear as a set.
Excessive noise during operation
→
Replace
the crankshaft assembly and balancer driven
gear as a set.
5. Inspect:
• Primary sheave drive shaft assembly
Damage
→
Replace.
6. Measure:
• Crankshaft-journal-to-crankshaft-journal-
bearing clearance
Out of specification
→
Replace the crankshaft
journal bearings.
Crankshaft-journal-to-crankshaft-
journal-bearing clearance:
0.027 ~ 0.045 mm
(0.0011 ~ 0.0018 in)
Summary of Contents for FX10X 2008
Page 2: ......
Page 312: ...7 36 FI ...
Page 333: ...8 21 ELEC CHARGING SYSTEM ...
Page 341: ...8 29 ELEC LIGHTING SYSTEM ...
Page 404: ...9 43 SPEC CABLE ROUTING 9 1 2 3 4 5 6 6 7 7 8 ...
Page 406: ......
Page 407: ......