4-10
POWR
TR
PRIMARY SHEAVE AND DRIVE V-BELT
• Loosen the primary sheave bolt completely.
• Retighten the primary sheave bolt to specifica-
tion.
T
R
.
.
Primary sheave bolt:
2nd:
60 Nm (6.0 m · kg, 43 ft · lb)
4. Adjust:
• V-belt position
Refer to “DRIVE V-BELT” in CHAPTER 2.
• Sheave offset
• Secondary sheave free play (clearance)
Refer to “SHEAVE OFFSET ADJUSTMENT”
in CHAPTER 2.
Summary of Contents for FX10X 2008
Page 2: ......
Page 312: ...7 36 FI ...
Page 333: ...8 21 ELEC CHARGING SYSTEM ...
Page 341: ...8 29 ELEC LIGHTING SYSTEM ...
Page 404: ...9 43 SPEC CABLE ROUTING 9 1 2 3 4 5 6 6 7 7 8 ...
Page 406: ......
Page 407: ......