3-9
CHAS
Order
Job name/Part name
Q’ty
Remarks
15
Throttle cable holder
1
16
Throttle cable
1
Disconnect.
17
Right handlebar switch/throttle lever
assembly
1
18
Upper handlebar holder
2
19
Handlebar
1
20
Steering joint
1
NOTE:
After installing all parts, refer to “CABLE
ROUTING” in CHAPTER 9, to check the
cable and lead routing.
For installation, reverse the removal proce-
dure.
(4)
É
18
2
20
10 Nm (1.0 m
•
kg, 7.2 ft
•
lb)
23 Nm (2.3 m
•
kg, 17 ft
•
lb)
È
:
É
:
2
3
3
4
5
6
7
7
9
10
8
11
14
15
16
17
19
17
12
13
È
1
2
2
Summary of Contents for FX10X 2008
Page 2: ......
Page 312: ...7 36 FI ...
Page 333: ...8 21 ELEC CHARGING SYSTEM ...
Page 341: ...8 29 ELEC LIGHTING SYSTEM ...
Page 404: ...9 43 SPEC CABLE ROUTING 9 1 2 3 4 5 6 6 7 7 8 ...
Page 406: ......
Page 407: ......