NOx-N
Maintenance
3 - 39
ba43110e05
01/2011
Caution
Standards must not be contaminated! A lid (orange) with suction tubing
is included within the scope of delivery of the calibration standards. Use
this lid for connecting the calibration standard. The suction tubing must
be rinsed with the standard to be used beforehand.
11
Pour a small amount of the first standard into a beaker.
12
Completely submerse the suction tube of the (orange) lid in the
beaker.
13
Screw the lid onto the first calibration standard.
14
Connect the standard with the specified concentration of NO3
-
to the connection for dist. H2O (red) and confirm with
3
.
The measurement is performed. The remaining time appears
on the display.
15
After the waiting time has expired, the prompt for the next
standard appears on the display:
Summary of Contents for TresCon NOx-N
Page 20: ...Overview NOx N 1 16 ba43110e05 01 2011 ...
Page 92: ...Maintenance NOx N 3 44 ba43110e05 01 2011 ...
Page 98: ...What to do if NOx N 4 6 ba43110e05 01 2011 ...
Page 108: ...Appendix NOx N 6 8 ba43110e05 01 2011 ...
Page 111: ......