NOx-N
Maintenance
3 - 19
ba43110e05
01/2011
11
Replace the pump tubings. Insert a new pump tube in the
pump cassette so that the second section is on the suction
side.
12
Click the cassette into place in the peristaltic pump and close
the gripping lever.
13
Connect the sample tubing to the overflow vessel again.
14
After performing the tasks, confirm each of the prompts on the
display with
3
. After the last confirmation, the 2nd part of
the procedure begins immediately. The remaining time
appears on the display.
Standard/sample pump tubing:
blue/blue/blue
Summary of Contents for TresCon NOx-N
Page 20: ...Overview NOx N 1 16 ba43110e05 01 2011 ...
Page 92: ...Maintenance NOx N 3 44 ba43110e05 01 2011 ...
Page 98: ...What to do if NOx N 4 6 ba43110e05 01 2011 ...
Page 108: ...Appendix NOx N 6 8 ba43110e05 01 2011 ...
Page 111: ......