Î
Press the fueling nozzle onto
the new data interface
(Pos. 9).
Attention:
The connector of
the fueling nozzle must be
inserted into the connector
port of the data interface.
Î
Screw the three new cylinder
screws evenly into the data
interface (Pos. 9) to fix the
data interface on the fueling
nozzle.
Tightening torque 7 Nm.
Î
Screw the pressure piece up
to the stop into the data
interface (Pos. 9) using a
slotted screwdriver.
Î
Check the electrical
conductivity of the data in-
terface (Pos. 9) to the fueling
nozzle. Measure electrical
conductivity between the
cylinder screw and the spring
plunger.
Electrical conductivity
1.000 Ohm max.
MD-10013-L51-R1.6.0-03
Page 38
Operating instructions
AE
Summary of Contents for TK17 H2
Page 2: ......