![Wacker Neuson E3000 Operator'S Manual Download Page 48](http://html2.mh-extra.com/html/wacker-neuson/e3000/e3000_operators-manual_3125736048.webp)
wc_tx001951gb.fm
48
Operation
E 3000
4.10
General Sequence of Operation
Follow the sequence of operation below. Refer to the specific topic for details.
Task
When/Where
See Topic
1. Check HTF level.
Before leaving for the job site.
Or, when at the job site before
daily operation.
4.11 / 4.15
2. Check fuel level.
4.13 / 4.15
3. Position the machine.
At the job site.
4.14
4. Perform pre-starting checks.
4.15
5. Connect power.
4.16
6. Start the generator (if equipped)
4.17
7. Power up the machine.
4.18
8. Run the machine.
—
a. Preheat the HTF (if necessary).
4.19
b. Initiate HTF flow.
4.20
c. Unwind and position the hoses.
4.22 / 4.23
d. Monitor the operating parameters.
4.24
e. Rewind the hoses.
4.25
9. Shut down and pack up the machine.
4.26
Summary of Contents for E3000
Page 6: ...Foreword wc_tx002028gb fm 6...
Page 39: ...ghi_tx001160gb fm 39 E 3000 Lifting and Transporting Notes...
Page 77: ...wc_tx001951gb fm 77 E 3000 Operation Notes...
Page 97: ...ghi_tx001162gb fm 97 E 3000 Accessories wc_gr008560 a b LR RR RS LS HX 50 HX 50...
Page 99: ...ghi_tx001162gb fm 99 E 3000 Accessories wc_gr008561 a LR LS HX 50...
Page 103: ...ghi_tx001162gb fm 103 E 3000 Accessories wc_gr008582 HX 100 HX 100 a b LR RR LS RS...
Page 105: ...ghi_tx001162gb fm 105 E 3000 Accessories wc_gr008583 HX 100 a LR LS...
Page 182: ...MSDS Dowfrost HD 50...
Page 186: ...wc_tx001673gb fm 186 Fuji Temperature Controller...
Page 199: ...Tire Safety Information...
Page 201: ...wc_tx001952gb fm 201 E 3000 Schematics 12 2 Composite Schematic Machine with Gas Burner...
Page 205: ...wc_tx001952gb fm 205 E 3000 Schematics 12 4 Circulation System Circuit...
Page 206: ...wc_tx001952gb fm 206 Schematics E 3000 12 5 Rewind System Circuit...
Page 207: ...wc_tx001952gb fm 207 E 3000 Schematics 12 6 Gas Train Schematic...
Page 208: ...wc_tx001952gb fm 208 Schematics E 3000 12 7 Generator...
Page 213: ......