wc_tx002070gb.fm
132
Burner Setup—Gas
E 3000
7.10
Checking and Adjusting the Burner Gas Pressure
Requirements
Machine shut down
Adequate supply gas pressure
Manometer
Checking
pressure
Follow the procedure below to check and adjust the burner gas pressure.
1. Turn the control knob
(a)
to the “OFF” position.
2. Locate the pressure test port
(c)
.
3. Insert a small screwdriver into the pressure test port and back off the needle
valve two revolutions.
4. Connect the hose of the manometer
(d)
to the pressure test port.
5. Turn the control knob to the “ON” position.
6. Start the machine.
7. With the burner firing, check the pressure reading on the manometer. See
section
Technical Data
for the correct pressure.
This procedure continues on the next page.
wc_gr009000
a
wc_gr008997
c
wc_gr008998
d
Summary of Contents for E3000
Page 6: ...Foreword wc_tx002028gb fm 6...
Page 39: ...ghi_tx001160gb fm 39 E 3000 Lifting and Transporting Notes...
Page 77: ...wc_tx001951gb fm 77 E 3000 Operation Notes...
Page 97: ...ghi_tx001162gb fm 97 E 3000 Accessories wc_gr008560 a b LR RR RS LS HX 50 HX 50...
Page 99: ...ghi_tx001162gb fm 99 E 3000 Accessories wc_gr008561 a LR LS HX 50...
Page 103: ...ghi_tx001162gb fm 103 E 3000 Accessories wc_gr008582 HX 100 HX 100 a b LR RR LS RS...
Page 105: ...ghi_tx001162gb fm 105 E 3000 Accessories wc_gr008583 HX 100 a LR LS...
Page 182: ...MSDS Dowfrost HD 50...
Page 186: ...wc_tx001673gb fm 186 Fuji Temperature Controller...
Page 199: ...Tire Safety Information...
Page 201: ...wc_tx001952gb fm 201 E 3000 Schematics 12 2 Composite Schematic Machine with Gas Burner...
Page 205: ...wc_tx001952gb fm 205 E 3000 Schematics 12 4 Circulation System Circuit...
Page 206: ...wc_tx001952gb fm 206 Schematics E 3000 12 5 Rewind System Circuit...
Page 207: ...wc_tx001952gb fm 207 E 3000 Schematics 12 6 Gas Train Schematic...
Page 208: ...wc_tx001952gb fm 208 Schematics E 3000 12 7 Generator...
Page 213: ......