58
Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
•
1. Opening the heat pump
..................................................................................................... 59
•
2. Compiling reports
.............................................................................................................. 59
•
3. Purging the refrigerant lines and indoor unit
.................................................................. 59
•
4. Checking the refrigerant lines for leaks
........................................................................... 59
•
5. Evacuating the refrigerant lines and indoor unit
............................................................ 60
•
6. Charging the refrigerant lines and indoor unit
................................................................ 61
•
•
•
7. Checking the refrigerant circuit for leaks
........................................................................ 62
•
8. Filling and venting the secondary side
............................................................................ 62
•
•
•
9. Checking the expansion vessel and heating circuit pressure
....................................... 63
•
•
10. Checking the indoor unit electrical connections for firm seating
•
•
•
11. Checking that the fan in the outdoor unit can run freely
............................................... 63
•
12. Cleaning the outdoor unit heat exchanger (evaporator)
................................................ 64
•
13. Checking the thermal insulation of flared connections
•
•
14. Checking the outdoor unit electrical connections for firm seating
............................... 65
•
•
•
15. Closing the heat pump
....................................................................................................... 65
•
•
•
16. Switching on the power supply
........................................................................................ 65
•
•
•
17. Starting the heat pump
...................................................................................................... 66
•
18. Commissioning the system
............................................................................................... 66
•
•
•
19. Checking the heat pump for noise
................................................................................... 76
•
•
•
20. Checking the system function
.......................................................................................... 76
•
21. Instructing the system user
.............................................................................................. 76
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5790 931 GB