MUS0920201
07/10/2014 82
MELTON, S.L.U. - POLIGONO INDUSTRIAL AGUSTINOS CALLE G-34,31160 ORCOYEN, NAVARRA
TEL: 00 34 948 321580 Fax: 00 34 948 326584 e-mail: [email protected]
1. Remove the side frame.
2. Remove the pre-cut side where you wish to install the regulator with the
pressure gauge.
3. Position the regulator with the pressure gauge.
4. Position the depressurisation valve on the manifold.
5. Connect the tube by placing it through the rectangular hole on the bottom.