16
Explanation of command
4.2.19
AHIGH=
(setting of high limit of leak current of AC withstanding voltage test )
Function
Makes the setting of high limit of leak current of AC withstanding
voltage test.
Structure
AHIGH=
High leak current
High leak current 0.1~110.0mA is to be set.
Note
: Set value of high leak current can not be lower than low limit
value of leak current.
Transmission
AHIGH=10.0mA
…... Sets the high limit of leak current of AC withstanding
voltage test at 10.0mA.
Response
When 8526 received the effective command setting.
ERROR=0
…….……. When the Response Setting is ON.
No response …………….. When the Response Setting is OFF.
4.2.20
AHIGH?
(read-out of high limit value of leak current of AC withstanding voltage test)
Function
Reads out the high limit value of leak current of AC withstanding
voltage test.
Structure
AHIGH?
Transmission
AHIGH?
Response
AHIGH=10.0mA
..…. Indicates the high limit of leak current of ACwithstanding
voltage test 10.0mA.