5.4.7 Dry mortarless installation with installation kit WA / WA2
Fig. 36: Dry mortarless installation on a solid wall, with installation kit WA / WA2
1
FKRS-EU
2.1
Mortar
2.5
Installation kit WA / WA2
3.1
Solid wall
5.4
Threaded rod as push through installation with
washers and nuts
7.14
Reinforcing board, calcium silicate,
thickness = 30 – 50 mm or mineral wool,
≥
1000 °C,
≥
140 kg/m³, thickness = 50 mm
9.2
Extension piece / duct with shortened flush
with the wall
Up to EI 90 S
Additional requirements: dry mortarless installation with installation kit WA / WA2 on solid walls
Solid wall
Installation kit WA / WA2, see
≥
75 mm distance from fire damper to load-bearing structural elements
≥
200 mm distance between two fire dampers
1.
Create an appropriate opening with
Æ
DN + 30 [-20 / +2] mm, compensate for wall unevenness and fix the
installation kit by means of push through installation (M8 or M10).
2.
Shorten the mortared-in duct flush with the wall, create a reinforcing board (7.14), compensate for wall
unevenness and fix the installation kit by means of push through installation (M8 or M10).