83
APPENDIX
B-3 Installation
1. Make sure all power to the RAID storage is disconnected.
2. Install the “six eaves copper pillars” on the three mounting
position (NH1, NH2 and NH3) and secures it using round head
screws.
3. Connector J2 is available for the optional battery backup
module. Connect the BBM cable to the 12-pin (J6) battery con-
nector on the controller.
4. Integrators provide pre-drilled holes in their cabinet for secur-
ing the three “six eaves copper pillars” on the BBM using round
head screws.