![Teledyne ProEM Series System Manual Download Page 31](http://html1.mh-extra.com/html/teledyne/proem-series/proem-series_system-manual_1080561031.webp)
31
Chapter 3: Installation Overview
lists the sequence of actions required to install a ProEM system and prepare
to gather data. Refer to the indicated references for additional information.
Refer to
Section 3.1, System Block Diagrams
, on page 32 for high-level block diagrams
of typical system configurations.
Table 3-1: ProEM Installation Actions (Sheet 1 of 2)
Action
Refer to…
1.
If the system components have not already been unpacked,
unpack them and inspect their carton(s) and the system
components for in transit damage.
Section 4.1, Unpacking the
System
, on page 35
2.
Verify that all system components have been received.
Section 4.1, Unpacking the
System
, on page 35
3.
If the components show no signs of damage, verify that the
appropriate power cord has been supplied with the power
supply.
Section 4.1, Unpacking the
System
, on page 35
4.
If the Ethernet adapter card provided with the system is not
already installed in the host computer, install it.
Refer to the manufacturer’s
instructions.
5.
If the application software is not already installed in the host
computer, install it.
Section 4.8, Software
Installation
software manual.
6.
Depending on application, attach lens to the camera or
mount the camera to a spectrometer.
Section 4.4, Attaching a
Lens to a C-Mount Adapter
on page 38.
Appendix C, Spectrograph
Adapters
, on page 147
7.
With the power supply disconnected from the camera,
connect the Ethernet cable to the GigE connector on the
rear of the camera and to the Ethernet port on the installed
Ethernet card.
—
8.
Air-Cooled System:
Plug the power supply into the rear of
the camera and plug the power supply into the power
source.
—
Liquid-Cooled System:
Make the hose and power
connections to the camera and plug the circulator into the
power source. Add coolant if necessary. Turn on the
circulator.
Section 4.7, Making the
Camera-Circulator
Connections for a
CoolCUBE
9.
Turn the Camera on.
—
10. Turn on the computer and begin running the application
software.
Software Manual
11. Enter the hardware setup information.
Software Manual
Summary of Contents for ProEM Series
Page 1: ...www princetoninstruments com ProEM System Manual 4411 0126 Issue 3 September 26 2019 ...
Page 10: ...10 ProEM System Manual Issue 3 This page is intentionally blank ...
Page 16: ...16 ProEM System Manual Issue 3 This page is intentionally blank ...
Page 30: ...30 ProEM System Manual Issue 3 This page is intentionally blank ...
Page 50: ...50 ProEM System Manual Issue 3 This page is intentionally blank ...
Page 88: ...88 ProEM System Manual Issue 3 This page is intentionally blank ...
Page 114: ...114 ProEM System Manual Issue 3 This page is intentionally blank ...
Page 122: ...122 ProEM System Manual Issue 3 Figure 7 8 LightField Settings 4411 0126_0078 ...
Page 136: ...136 ProEM System Manual Issue 3 This page is intentionally blank ...
Page 146: ...146 ProEM System Manual Issue 3 This page is intentionally blank ...
Page 152: ...152 ProEM System Manual Issue 3 This page is intentionally blank ...
Page 161: ...This page is intentionally blank ...